Task

A large and complex aircraft component test rig required moving from one of the customers sites to another.

The requirement was to complete the task within the short timescale required so that testing of the com­ ponents was not compromised.

Relocation

Powys Engineering dismantled the test rig, transported it and installed it at the new site. This included the disconnection and reconnection of all pipework, electrical and instru­mentation cables.

During the installation, Powys Engineering also supplied and commissioned a complete new chiller pipework system. The task was completed within the required timescale.
 